ALCATEL BTS INSTALLATION AND COMMISSIONING PDF

BTS ON-Line commissioning Procedure using B10 Go to configuration>> Hardware setting>>Begin HW modification. Edit Sector Mapping and. Alcatel Bts Installation And Commissioning Pdf. BTS OFF-Line commissioning. Procedure OF ALCATEL BTS using B Prepared By: Umair. Installation & Commissioning – BTS, Microwave I&C of all Types of BTS-2G ( NSN, Ericsson, Huawei, ZTE, Alcatel-Lucent etc) in all possible installation types .

Author: Salkis Ninris
Country: Libya
Language: English (Spanish)
Genre: Travel
Published (Last): 8 April 2004
Pages: 69
PDF File Size: 10.57 Mb
ePub File Size: 19.89 Mb
ISBN: 769-7-78649-468-7
Downloads: 27474
Price: Free* [*Free Regsitration Required]
Uploader: Shaktihn

Click [ Write back ] if modifications were made and wait for “Updating flash Tell us some more! Not finding what you are looking for?

See Figure 44 use DES 2. Save the “Commissioning Report” window: See Information Required 4. Click [ Manufacturing part ] Section 1.

BTS Installation and Commissioning

In this situation perform one of the following: Power supply at the site power panel: See Figure 24 Power on the Power 1. If the power modules are OK: Check the declaration of battery type and number of branches by pressing Number of Battery Units the Status button on BCU1 until the battery information is displayed ex.

  A LA CARGA GUNG HO DESCARGAR PDF

At BTS Terminal choose: See Figure 40 2.

Check that there are no alarms Result: Power Up the BTS and 1. The modules to be added and all the necessary supplies should already have been delivered on site!

BTS commissioning Alcatel A9100, n some troubleshooting

Before transmitting on the antenna: It’s worth a thousand words. Check the Power Supply 1. The email address entered is already associated to an account. Activation is finished when the options in the commissioning menu become active.

BTS commissioning Alcatel A, n some troubleshooting – Fixya

Check the heat exchangers fans have started Exchangers 3. Analyze the results See Table 4. Perform the Test 1.

Please assign your manual to a product: Audience This document is intended for: Inhibit Power Down Timer. Bridge removal for 3 phase AC power 4. Close the BTS power panel 7.

Check also the voltage between neutral and ground See Figure 42 Result: Refer to the corresponding document for checking the SW version. See Figure 38 8. Wait for the message installatiion sending is stopped”.

Wait for the VSWR measurement received message in the status window 3. AC Switch Board 3. Wait for the test to finish 2. See Figure 19 2. Connection of the GPS antenna Option: You can’t post conmments that contain an email address.

  AJAX AND FLASH DEVELOPMENT WITH OPENLASZLO PDF

Switch OFF the V mains at site power panel and check with the multimeter the voltage between each line L and neutral N. This procedure applies only for Alcatel BTSs equipped with batteries.

Access Technologies & Services LLC Qatar | Engineering Services Projects

Alun Cox Level 3 Expert Answers. Approximate 0V voltage value means power OK. Commissionihg for the Updating flash and Cabling detection in progress Click the RA and RB buttons, if they appear black they appear greyed out if the previous value measured was the same one 4. Help Center Find new research papers in: Check that the service lights are OK.

Line disconnected A low residual AC voltage should be present between neutral and ground 4. Click [ Sector mapping ]. If any boards were changed during commissioning, run Inventar: Check the CCL 6.