ARINC REPORT 668 PDF

ARINC REPORT ()_信息与通信_工程科技_专业资料。GUIDANCE FOR TOOL AND TEST EQUIPMENT (TTE) EQUIVALENCY. ARINC provides guidelines for the process used to establish the equivalency of TTE and related procedures other than that recommended. Buy ARINC Guidance For Tool And Test Equipment (Tte) Equivalency from SAI Global.

Author: Nagul Kazrashura
Country: Gabon
Language: English (Spanish)
Genre: Business
Published (Last): 13 December 2015
Pages: 326
PDF File Size: 12.21 Mb
ePub File Size: 15.41 Mb
ISBN: 805-2-60483-501-7
Downloads: 67465
Price: Free* [*Free Regsitration Required]
Uploader: Kigazilkree

There are also many Arinc report of related with this subject Traditionalists may ask, what is so great about arlnc report arinc report guide Pdf? Airline support — number and strength of airline support for the project, including whether or not an airline chairman has been identified? For details see drawing number 53 sheets 1 and 2.

ARINC REPORT 668 EPUB

Any project extending beyond a single year will be reviewed annually before being reauthorized. Safety Ensure that all safety procedures are understood before commencing any work on the equipment.

Freee book download Belinda Bennett. Project Scope Describe the scope of the project clearly and concisely. The tooling is of simple construction with no moving parts and is fabricated from steel which is dimensionally stable for the accuracy required. Maintenance task — High level description of maintenance task at hand e. WithBatson says, the group decided “not to specify what language to use from one system to the next.

Alternate tool has equivalent material to handle the heat of the housing being assembled and all safety constraints depend on the use of protective clothing for operator. Quality Management System Return To Service – A quality assessment which states that a unit is ready to be installed in the assembly or system for which it was designed and will operate within acceptable specified parameters. Additionally, component manufacturers should assure recommended TTE is not over specified with regard to the specified task.

Compliance Statement This tooling equivalency has been based on ANZES being functionally interchangeable with Boeing C, compatible with the procedures called up, and safe for the equipment and use it is designed for. Flying Secure in Today’s Aviation Environment. Do the process documents define: It consists of a test box Category 3 that has been designed and fabricated in-house and includes standard shop test equipment Category 2 also used in various other applications.

  APOSTILA ANCOR PDF

ARINC REPORT ()_图文_百度文库

How over-specified requirements are corrected? Your consent to our cookies if you continue to use this website. This documentation may include: For example, narrative sentences may be changed to bullet items, etc. For instance, includes references to a number of procedures and guidelines to determine equivalency between an independent test provider and OEM test specifications defined in the CMM.

Modify dash 7 base by machining slot 11 x 0. More On This Topic.

Schedule — what regulatory, aircraft development or modification, airline equipment upgrade, or other replrt events drive the urgency for this project Accepted proposals will be assigned to a subcommittee for action with one of two priorities: Mueller says that operators need to manage fleet-wide software configuration for on-board loadable equipment.

Evaluation criteria will include: Adjustment Procedures Tools may be reworked to ensure compliance with the appropriate drawing. Category 3 — Special information available TTE, sufficient technical 2. An APIM may be initiated by anyone in the airline community, e. The Transient Nature of Digital Design.

BMH 53 Accuracy Specification As the bearing centreline distance for the slat actuator is derived from the geometry of the test fixture and the known distance from the actuator mount to the fixed distance block it is necessary to verify these dimensions. Boeing Component Maintenance ManualL. The aircraft or component manufacturer should ensure that if a change occurs in the source documentation that impacts existing return to service RTS testing, then this change should be reflected with the Component Maintenance Manual CMM or Aircraft Maintenance Manual AMM.

Attachment 4 provides a checklist to assist in performing TTE equivalency determinations. The analysis repory the EFICD schematic and the ATE test procedure delivers sufficient information for an equivalent test solution using a locally fabricated adapter box, standard power supplies, digital multimeter for voltage and current measurements and an ARINC reader.

  BRETT GARSED LICKS PDF

A TTE equivalency certificate?

Determine that the alternate TTE and related procedures meet the requirements of the srinc task or group of tasks at hand – substitution approved for specified tasks only Determine that the alternate TTE and related procedures are equivalent identical to the original recommendation – global substitution 3. Seller Furnished Equipment Seller Purchased Equipment Tool teport Test Equipment The process of evaluating the equivalency of the TTE to ensure compliance with the functional, performance and interface requirements of the task.

All projects are typically approved on a calendar year basis. Calibration Period Specification Because it was published afterARINC contains parts that overlap with some of the material in All dimensions checked must conform to the specifications contained in Table Another problem with previous versions of ARINC was that manufacturers would send incomplete information to the operator or third-party TPS provider.

The protocol will be independent of the underlying data stream or page description language but will be usable by all classes of printers.

Equivalence is based on meeting the derived requirements and correlating the alternate TTE result with the OEM required result. Primarily, this report is concerned with equipment specified or recommended for the purpose of performing repoet tasks concerning the airworthiness of an article e.

The new document will be more broad and concise, and will be restructured based on industry feedback. This section describes the expected roles and responsibilities of each group throughout the equivalency process. Attachment 4 is general guidance and may be modified as needed.

The implementation-specific data will be moved into appendices or attachments at the end of the document. Get arinc report guide PDF file for reporf from our online library. Deferred to a subcommittee for refinement — the subcommittee will be requested to, for example, gain stronger airline support or resolve architectural issues?